ARKLOGO13a.jpg

Moormann Brothers 7-S Vertical Gauge Parts

7Sinst.gif

INSTALLATION INSTRUCTIONS. MODEL 7-S

  1. Locate gauge position on ground - mark top edge of tank directly above ground location.
  2. Measure, out and thread 2" pipe (as marked on print).
  3. Use pipe dope on all connections.
  4. Assemble both A-30 elbows and 2" pipe as shown on print.
  5. Screw (1) elbow A-30 onto 2" pipe with reducing bushing, close nipple and union as shown on print; other A-30 elbow into 2" nipple in tank then screw other end of 2" pipe Into tank elbow, make straight with tank marking.
  6. Level 2" pipe, use temporary wood brace or alignment flange, if necessary. Secure brace to top of tank
  7. Set gauge housing with eccentric cap assembled on ground directly below overhanging elbow.
  8. Measure for 1 " pipe (reducing bushing In elbow to eccentric cap V-71 on gauge housing) allow for threads, cut and thread 1" pipe.
  9. Screw 1" pipe into elbow, then remove V-71 eccentric cap from housing and put on 1" pipe. CAUTION - Be sure eccentric cap Is straight and 1" outlet Is farthest away from tank.
  10. Fasten pulley rack with large pulley up to eccentric cap using stainless steel pins.
  11. Assemble other pulley rack in counterweights with large pulley down.
  12. Place counterweight on ground directly beneath eccentric cap pulley rack.
  13. Remove A-33 caps from both elbows.
  14. Thread tape from tank elbow with numbers up and clip ends first through 2" pipe and over elbow pulleys, down through 1" pipe and out eccentric cap, straight down and around bottom pulley. In C/W and up and over top pulley In eccentric cap, down to medium pulley up and over medium pulley down and around small pulley on CIW and up and around small pulley on eccentric cap, down and fasten to lug on counterweight pulley rack - use stainless steel pin. CAUTION - Do not thread tape over or under cross bars In pulley rack. Use caution - do not kink or bend tape.
  15. Fasten tape to float with tape clamp (as per print). CAUTION -Do not fasten tape clamp too tight as this may damage tape.
  16. Place eccentric cap gasket on housing top and insert counterweight assembly into housing. CAUTION -Do not allow C/W to drop or Jerk as this may cause damage to bearings, also be sure the tape is in groove of pulleys and not on the edge.
  17. Fasten outside housing to eccentric cap with observation window directly below 1" pipe.
  18. Place outside strand of tape over tape guide in observation window, CAUTION - Do not bend or kink tape and put ONLY ONE (1) strand of tape over the tape guide.
  19. If tank Is empty adjust tape reading at 1.3/8" (float draft), If it is partially full set reading exactly with stick, make major tape reading adjustments with the float by slipping tape through tape clamp. Minor adjustments (within 1" make with observation finger). DO NOT CUT OFF EXCESS TAPE UNTIL FINAL READING IS OBTAINED
  20. In setting the reading on the gauge, 1/2", 1/4" or even 1/8" is not close enough, be particular, set gauge to the exact amount of liquid in tank.
  21. CAUTION - Let float down in tank easily. Do not let it drop.
  22. Assemble observation frame and lid A-34 & A-38 place on housing, tighten for vapor.proofing.
  23. Fix base for housing either, concrete, wood post, or steel plate welded to tank, CAUTION - Do not weld gauge housing to tank.
  24. In most climates condensation forms inside the tank and gauge. A drain plug has been provided for draining at the bottom of the housing. In most climates this is necessary two times a year (spring and fall). However, in extreme cases draining is required more often.

Maintenance Instructions For All Models
The only maintenance necessary for perfect operation of the MOORMANN BROTHERS GAUGE is that the drain plug located It the bottom of the housing be opened 2 times a year (Fall and Spring) In normal climates. However, in severe climates opening may be required more often. We have some precautionary measures that are listed in our Installation Instructions that If followed, will Insure perfect operation of our units. Some of these measures are listed below;

Moormann Bros. A-30 Elbow Assy. A-30 Price: $268.00
Qty:
A-30 Elbow Assy. complete with A-33 elbow cap, S-24 screws and V-83 gasket
Moormann Bros. A-33 Elbow Cap A-33 Price: $40.00
Qty:
A-33 Elbow Cap, S-24 Screws & V-83 Gasket
Moormann Bros. B-15 Bushing B-15 Price: $15.00
Qty:
B-15 Bushing 2" to 1"
Moormann Bros. D-16 Drain Plug D-16 Price: $10.00
Qty:
D-16 Drain Plug
Moormann Bros. GS-7 Gasket Set GS-7 Price: $43.00
Qty:
GS-7 Gasket Set contains:
  • V-83 elbow cap gaskets (2)
  • v-81 Observation Case gasket
  • V-82 Observation Case gasket
  • V-84 Eccentric cap gasket
Moormann Bros. PE-7 Parts Envelope PE-7 Price: $53.00
Qty:
PE-7 Parts Envelope contains
  • GS-7 complete gasket set
  • V-86 observation case glass
  • V-94 observation case finger
  • S-28 observation case finger screw
  • S-24-S observation case screws (4)
  • V-96-S Pins (4)
Moormann Bros. V-71 Eccentric Cap. V-71 Price: $135.00
Qty:
V-71 Eccentric Cap with V-84 Gasket and S-26-V-S Screws and nuts (8)
Moormann Bros. V-72 Counterweights V-72 Price: $143.00
Qty:
V-72 Counterweights (set of 2)
Moormann Bros. V-73 Pully Rack Assy. V-73 Price: $203.00
Qty:
V-73 Pully Rack Assy.
Moormann Bros. V-75-S Float (Stainless Steel) V-75-S Price: $567.00
Qty:
V-75-S Stainless Steel Float with V-93 Clamp for use in chemical applications
Moormann Bros. V-75-S-V Float (Stainless Vented) V-75-S-V Price: $603.00
Qty:
V-75-S Stainless Steel Float with V-93 Clamp, vented for use in heated product applications
Moormann Bros. V-77 Gauge Housing V-77 Price: $660.00
Qty:
V-77 Gauge Housing complete with V-71 eccentric cap, A-34 Frame, A-36 Lid, D-16 Drain Plug and PE-7 Parts envelope.
Moormann Bros. V-93 Tape Clamp V-93 Price: $22.00
Qty:
V-93 Tape Clamp with Screws and Nuts
Updated 3/30/22
View Full HTML Site